The short answer
A traceability matrix for IEC 62304 shows, for every software requirement, where it came from, which risk controls it carries, how it was verified and in which release it shipped. Jira has no built-in matrix. You create one by keeping requirements, risk controls and tests as linked work items with named link types, then generating the matrix from JQL filters, a Confluence report or an app, release by release. Your quality or regulatory lead decides what goes into the design file.
Most SaMD teams we meet can produce a traceability matrix. The question is how long it takes, and whether anyone trusts it the day after. This guide follows one team’s release in Jira and Confluence, screen by screen: how the chain is modeled, how the gaps show up while there’s still time to close them, and how the matrix for a release becomes a record instead of a spreadsheet.
The example: a remote monitoring app heading into release 2.4
The team in this guide is fictional, but its setup is real: we built it on a Jira Cloud site, and every screen below comes from it. About 20 people build a remote monitoring app for patients sent home after a hospital stay for heart failure or a lung condition. Patients measure oxygen saturation (SpO2) and pulse with a Bluetooth pulse oximeter; a phone app sends the readings to a cloud service; monitoring nurses at the hospital see them in a web dashboard and get an alert when a reading falls outside limits the clinician set. The app doesn’t diagnose and doesn’t change treatment. Nurses decide what to do.
The team develops the software under IEC 62304, and their quality lead classified it as software safety class B. That classification is their decision, not ours, and it shapes how much design documentation they need.
Release 2.3 shipped in October. Release 2.4 is due in late January, and three things are happening at once, as they usually are:
- A requirement changed mid-sprint. Clinicians asked for alert limits per patient instead of one limit per ward.
- A requirement has no test. “Alert volume can be set” was added late, and nobody has written its verification yet.
- A third-party library is being upgraded. The new Bluetooth library has a known problem reconnecting after the phone sleeps.
Each of these is a traceability question. Let’s see how the setup answers them.
What does IEC 62304 ask you to trace?
IEC 62304 doesn’t prescribe a matrix format. Clause 5.1.1 asks that your software development plan provides for traceability between system requirements, software requirements, software system tests and the risk control measures implemented in software. The links to plan for:
- System requirements to software requirements. Each software requirement traces back to the system-level need it serves. Under ISO 13485, design inputs come from the intended use, including user needs; the chain usually starts there.
- Software requirements to architecture and detailed design. The rigor depends on your software safety class: architecture is required from class B, detailed design only for class C.
- Requirements to verification. Which test shows that the requirement is met, and what the result was for this release. Software system tests apply in every class since Amendment 1 (2015); unit and integration verification start at class B.
- Hazards to risk control measures to verification. Clause 7.3.3 asks you to document traceability from each hazardous situation, through the software item and the software cause, to the risk control measure and its verification. This is where your ISO 14971 risk file and your backlog have to meet.
- Everything to a release. When you release (clause 5.8), you need to show what was in it, that it was verified, and which known residual anomalies it ships with.
If you sell in the US, the FDA’s Quality Management System Regulation (in force since 2 February 2026) incorporates ISO 13485 by reference. It dropped the term “design history file”; the FDA treats ISO 13485’s design and development file (clause 7.3.10) as its equivalent. The design-control traceability is essentially the same either way, and a US submission adds FDA’s software documentation expectations (Basic or Enhanced, from its 2023 premarket guidance).
A second edition of IEC 62304 is in drafting and proposes replacing the A/B/C classes with two process rigor levels. It isn’t published yet, so plan on the current edition.
How do you model traceability in Jira?
Keep it small and name things by what they mean. Our example team uses six work types of its own, a fix version per release, and four link types:
| Work type | What it holds | In our example |
|---|---|---|
| User need | What the user or clinician needs | “Nurse is warned in time when a patient’s readings fall” |
| Requirement | A testable software requirement with a stable ID | “An unacknowledged alert escalates to the charge nurse after 10 minutes” |
| Hazard | A software-related hazardous situation from the risk file | “Missed alert for a low SpO2 reading” |
| Risk control | The measure that reduces the risk | “Escalate unacknowledged alerts after 10 minutes” |
| Test | A verification test and its latest result | “Escalation after 10 minutes without acknowledgement” |
| SOUP item, Change request | Third-party software; a proposed change and its impact | The Bluetooth library; per-patient alert limits |
The link types carry the meaning, both ways: a requirement satisfies a user need, a risk control mitigates a hazard, a requirement realizes a risk control, a test verifies a requirement or a control, and a change request or SOUP item affects what it touches.
Example: the link types in Settings, Work items, Work item linking. Note “implements / is implemented by”: it belongs to Jira Product Discovery.
That screen shows a trap we hit while building this. Many traceability guides suggest “implements / is implemented by” for the link between a requirement and a risk control. On any site that also runs Jira Product Discovery, those exact words already exist as Product Discovery’s delivery link. Two link types with the same words make your searches ambiguous, so pick another verb. We use “realizes”.
Here’s what one requirement looks like with its chain in place:
Example: one requirement, its user need, the risk control it carries, its test and the story that built it, all on one screen.
A few rules keep the links reliable:
- Requirements are not stories. Stories describe work; requirements describe what the software must do. In the screen above, the story that built the escalation is a separate item. When the story closes, the requirement keeps its ID and its links.
- Name link types by meaning, both ways. “Relates to” can’t be reported on. “Is verified by” can.
- Check the links where they matter. Jira Cloud’s built-in validators can require a field, but none checks for a link of a given type. If a requirement must not reach Done without a linked test, you need a workflow app from the Atlassian Marketplace. Without one, a saved gap filter and an automation rule catch what slipped through, after the change rather than before it.
- Put design where design is read. Architecture and detailed design usually live in Confluence pages, linked to the requirements they cover.
- Pick one place for test results. Either a test management app on top of Jira or a Test work type with a result per release. Our example uses a Test work type with a “Test result” field. Not both.
How do hazards and risk controls fit in?
The risk file and the backlog usually live apart: hazards in a spreadsheet, controls in someone’s head, stories in Jira. Clause 7.3.3 is where that stops working. In our example, each software-related hazard is a work item, and its risk controls link to it with “mitigates”.
Example: the missed-alert hazard, its two risk controls, and the change request that reopened it for review.
The screen answers the auditor’s question without a spreadsheet: this hazard has two controls, one of them is done and verified, the other (a reconnect check added because of the library upgrade) isn’t built yet. Open the risk control and you see its test and the requirement that realizes it.
How do you create a traceability matrix in Jira, step by step?
These steps assume Jira Cloud and a Jira administrator on your team. Configuration took us under an hour; agreeing the names is the real work.
- Agree the chain on paper. Write down the objects from the table above and the links between them, and get your quality lead to sign the sketch off before anyone configures anything.
- Create the work types. Add them in Settings, then Work items, give each its own icon so people can tell them apart in a list, and add them to your space’s work type scheme. The Jira key (RPM-7) is your stable ID; don’t add a second ID field.
- Create the link types. In Settings, then Work items, then Work item linking, add one link type per relationship, each with an outward and an inward description. Check the list for words already in use.
- Add the few fields you need. Our example adds “Verification method” (Test, Inspection, Analysis) on requirements and risk controls, and “Test result” on tests. Nothing else.
- Create a fix version per release. Every requirement, risk control and test that belongs to release 2.4 carries fix version 2.4. That fixes what’s in the release; freezing the results at sign-off is a separate step (below).
- Link while the work happens. A requirement gets its test link when the test is written, not the week before release. Make it part of the Definition of Done for the story that builds it.
- Save the report filters and build the release page. One filter per question your quality lead asks, and one Confluence page per release (both below).
Start with one feature, not the whole backlog. The section on rollout explains why.
How do you find the gaps before the release?
Once the links exist, every gap is a query. These are the filters our example team keeps, run on the sample space:
| Question | JQL |
|---|---|
| Which requirements are in 2.4? | type = Requirement AND fixVersion = "2.4" |
| Which of them have a test? | type = Requirement AND fixVersion = "2.4" AND issueLinkType = "is verified by" |
| Which have no test? | type = Requirement AND fixVersion = "2.4" AND (issueLinkType is EMPTY OR issueLinkType not in ("is verified by")) |
| Which risk controls aren’t realized by a requirement? | type = "Risk control" AND (issueLinkType is EMPTY OR issueLinkType not in ("is realized by")) |
| Which tests verify RPM-5? | issue in linkedIssues(RPM-5, "is verified by") |
| Which tests in 2.4 haven’t passed? | type = Test AND fixVersion = "2.4" AND "Test result" != Pass |
Example: the “no test” filter finds the late requirement two months before the release, not the night before.
Three things we learned testing these on Jira Cloud:
- Keep the
is EMPTY ORpart.issueLinkType not in (...)on its own skips work items that have no links at all, which are exactly the ones you’re looking for. - Search by the inward phrase, or name the link type differently from its outward phrase. Atlassian’s linking documentation notes that a link-type search matches the link type’s name as well as both descriptions. So when a link type is named “Verifies” and its outward phrase is “verifies”,
issueLinkType = "verifies"returns both ends of the link: on our site, the tests and the requirements they verify. “is verified by” returned only the requirements. - Use
linkedIssues(). Atlassian’s newest documentation also names alinkedWorkItems()function; on the site we tested in November 2026 it was rejected, whilelinkedIssues()worked.
Put the gap filters on a dashboard the team looks at every sprint. A gap found in sprint 12 costs an hour; the same gap found in release week costs the release date.
How do you handle a change to a requirement?
This is where traceability pays for itself. In our example, clinicians asked for alert limits per patient: patients with chronic lung disease run lower SpO2 and set off too many alerts at the ward limit. The team records the request as a change request and links it, with “affects”, to everything the change touches.
Example: the change request lists what has to be re-checked: the requirement, both of its tests (back to “To Do”) and the hazard (back under review).
The impact analysis took minutes, because the requirement’s links already said which tests and which hazard depend on it. issue in linkedIssues(RPM-28, "affects") lists the same four items for the release review.
Where does third-party software (SOUP) fit?
IEC 62304 asks you to identify software of unknown provenance (SOUP), its version and the known anomalies that matter for your device. In our example the Bluetooth library is a SOUP item with its version and its known reconnect problem, linked with “affects” to the risk control that handles it. When the library is upgraded again, the change shows up in the same matrix as everything else, not in a separate list someone forgot to update.
How do you turn it into a release record in Confluence?
A Confluence page can show a table of Jira work items from a JQL query. Our example team keeps one page per release: requirements, risk controls, test results, open gaps and changes for 2.4, each section a live Jira table.
Example: the release page in Confluence. The tables are live Jira queries until the quality lead approves the page.
When the release ships, the quality lead reviews and approves the page. One thing to know before you treat that as the record: the Jira tables don’t freeze. We checked on the sample page. After saving a new version, we moved one requirement from To Do to In Progress, then opened the old version: it showed In Progress. Page history keeps your text, not the query results. So at sign-off, export the approved page to PDF and keep it with the release, or use a Marketplace app that captures the content at approval. Your quality lead decides which of those counts as the record.
For hundreds of requirements, several products, or test runs you want recorded one by one, a traceability or test management app from the Atlassian Marketplace can render the full matrix. Check that its export is something your quality lead can review and keep.
What does the matrix look like?
From the example team’s data, one row per requirement in 2.4:
| Requirement | Satisfies | Realizes risk control | Verified by | Result |
|---|---|---|---|---|
| RPM-5 Alert limits set per patient | RPM-2 Nurse is warned in time | None | RPM-19, RPM-20 | Not run (changed) |
| RPM-6 Alert within 60 seconds | RPM-2 | None | RPM-21 | Pass |
| RPM-7 Escalation after 10 minutes | RPM-2 | RPM-15 Escalate unacknowledged alerts | RPM-22 | Pass |
| RPM-9 Stale readings marked after 12 hours | RPM-3 Nurse can trust a reading | RPM-17 Mark stale readings | RPM-24 | Fail |
| RPM-11 Alert volume can be set | RPM-2 | None | None | No test |
The last row is the reason to generate the matrix instead of typing it.
What if IEC 61508 applies as well?
IEC 61508 is the general functional safety standard for electrical, electronic and programmable systems; IEC 62304 is the software life-cycle standard for medical devices. A product sometimes falls under both, for example a device with an industrial or automotive variant. Both expect you to trace requirements through design to verification, with different names and levels of rigor.
Don’t build two traceability models. Keep one set of work types and link types in Jira, then map each standard’s required links onto it in a short Confluence page your quality lead approves. Which standard applies, and at which level, is your quality and regulatory team’s decision.
Which gaps do we look for first?
When we take a SaMD team’s flow apart in a Teardown, these are the five gaps we check first:
- Requirements live inside stories or Word documents. No stable IDs, no acceptance criteria you can test, so nothing reliable to link to.
- The risk file is a spreadsheet. Hazards and controls are updated at a different pace from the backlog, and nobody can show which requirement carries which control.
- Test results aren’t tied to a release. Tests exist, but you can’t say which ones ran for 2.4, or what the result was.
- Changes skip the impact check. A requirement changes mid-sprint and nobody records which tests and risk controls are affected.
- Third-party software sits in a separate list. Versions and known issues aren’t linked to the releases that ship them.
None of these needs a new tool. Each one is a work type, a link type or a habit that isn’t there yet.
How do you get there without stopping delivery?
Don’t migrate everything at once. Take one feature that matters and trace it end to end, from the user need to the release, with the real team in real sprints. That pilot shows which types, links and rules you actually need. Then roll the pattern out area by area, and backfill links for what’s already shipped only where your quality lead needs it.
This is how the Product Ops Flywheel runs: Teardown maps where the chain breaks today, Blueprint traces one feature live, Implement sets it up in Jira and Confluence and trains the team. If you’d rather see where your own chain breaks first, the SaMD Traceability Check asks the questions this guide answers.
Who owns what?
The setup makes the evidence easy to produce; it doesn’t decide what the evidence must be. Your quality or regulatory lead owns your interpretation of IEC 62304 and ISO 13485, decides what goes into the design and development file, and signs off releases. Lottusa is an Atlassian consulting firm, not a regulatory consultancy: we build the flow in Jira and Confluence around the decisions your team makes.
Sources
- IEC 62304:2006 with Amendment 1:2015, clauses 5.1.1, 5.8 and 7.3.3, and Table A.1; requirements by safety class as summarized by the Johner Institute.
- ISO 13485:2016, clauses 4.1.6 and 7.3.10.
- FDA, Content of Premarket Submissions for Device Software Functions (June 2023), and Computer Software Assurance (updated February 2026).
- FDA, Quality Management System Regulation (21 CFR Part 820, effective 2 February 2026).
- Atlassian, Configure work item linking, JQL fields and JQL functions, checked 23 November 2026. All JQL in this guide was run on a Jira Cloud site on 23 November 2026.
The SaMD Traceability Check: 18 questions, about six minutes, your score right away.
Questions people ask
Does Jira have a built-in traceability matrix?
No. Jira gives you the pieces: work types, named link types, fix versions and JQL search. The matrix is a view built from those, as saved filters and dashboards, a Confluence page that lists the linked work items for a release, or a traceability or test management app from the Atlassian Marketplace.
Can Jira be used for medical device software development?
Yes. Jira and Confluence are widely used for medical device software development and documentation. What matters is that your process, not the tool, meets IEC 62304 and ISO 13485: defined work types, required links, controlled approvals and a validated way of using the tools. Jira gives you the structure; you still decide and document how you use it.
Do I need a separate requirements management tool?
Not necessarily. If requirements live as their own work type in Jira, with stable IDs, testable acceptance criteria and links to tests and risk controls, a separate tool is often not needed. Teams with very large requirement sets or heavy reuse across products sometimes add a dedicated app on top of Jira.
Does Jira need to be validated?
ISO 13485 asks you to validate computer software used in your quality management system, for its intended use and in proportion to the risk (clause 4.1.6). That means validating how you use Jira and Confluence (your workflows, required fields, approvals), not the products in general. FDA's Computer Software Assurance guidance (issued in final form in September 2025 and updated for the QMSR in February 2026) describes a similar risk-based approach. Because Atlassian Cloud changes continuously, plan how you re-check, not just the first validation.
Can Confluence hold the design history file (design and development file)?
Confluence can hold the documents that make up your design and development file, which the FDA now treats as the equivalent of the design history file, with page versions, review and approval. An app usually adds controlled approvals or electronic signatures. Your quality lead decides which records count as the file and how they're approved; the setup should make that easy to show.
How do you keep the matrix for an old release from changing?
Tie every requirement, test result and risk control to a fix version, so the release's scope is fixed. Then freeze the content itself at sign-off: a Jira table in Confluence is a live query, and even an old page version shows today's data. Export the approved page to PDF and keep it with the release, or use an app that captures the content at approval.
Why not call the link "implements"?
On any Jira site that also runs Jira Product Discovery, "implements / is implemented by" already exists as Product Discovery's delivery link. A second link type with the same words makes JQL searches on that phrase ambiguous. We use "realizes / is realized by" for a requirement that carries a risk control.